Probe Station
A step-by-step guide on working with the Probe Station
Last updated
A step-by-step guide on working with the Probe Station
Last updated
To learn more about the hardware and software involved, refer:
SMU - Analog DiscoveriesIf not using the tester adapter, connect W2 to the Gate probe and W1 to the Drain probe.
The Source and Body probes must be connected to GND.
The +1 & -1 connections should be connected around the drain resistor.
+2 should be connected to the Drain terminal.
Add images with the connections, more specifics.
simple mechanical probe manipulator
needs 4 probes (show where each of them are used)