💡Thermal Evaporator V1 Build (WIP)
Vacuum Chamber Assembly
1. Assemble the chamber frame and plates




2. Attach feedthroughs and/or blank flanges


3. Turn a face into a door and attach feet



Final product

Pumping down the Vacuum Chamber
1. Attach the turbo pump to the chamber
2. Connect the pressure gauge
Implement Heating Parts
Crucible Set-Up

Last updated
